Copia Metals reached out to us in 2020 with a specific concern, Our initial consultation and assessment led us to propose a multi-phase project aimed at creating a sheltered environment through strategic metal building installations. where we erected there first metal building to prevent dust pollution.
Phase One: The 6040s Container Canopy
We Installed A 6040s Container Canopy,
following this we installed a 4040s. The project took around 3 days, installing the 6040s in 2 days and 1 day for installation of the 4040s.
Phase Two: Elevating Protection with the 4040s
Now Copia have 3 buildings ready for a great waste yard system, for easy use and to help there customers receive the best experience and prices.

This picture is the day Varna finished the 4040s container canopy, erected onto 1.5t blocks. stacked 5 height.

This is a photo taken at the end of the first day erecting the 6040s.
.
Efficiency in Action: Project Completion in Three Days
Our commitment to efficiency was evident throughout the project. In a total of three days, Copia Metals' environment underwent a transformative journey. The quick and precise installation of both the 6040s and 4040s showcased not only our technical prowess but also our dedication to minimizing disruption to our clients' operations.
..
The Impact: A Cleaner, More Productive Future
Copia Metals is now equipped with a state-of-the-art metal building solution that not only prevents dust pollution but also enhances overall operational efficiency. The success of this project reinforces our belief that thoughtful and strategic installations can significantly improve industrial working conditions.
.